Validator Readiness
Prepare the operator information, infrastructure and node configuration required for the External Validator Pilot.
This page is for preparation only. It does not collect validator credentials or create an unofficial application channel.
Before You Apply
Complete these steps before the official onboarding channel opens.
Review Requirements
Confirm your server and operational setup meet the Validator Pilot requirements.
Prepare Operator Details
Collect the validator, operator and infrastructure information required for review.
Prepare the Node
Install, secure and synchronize the ORBAIC validator node before onboarding.
Await Submission Channel
Official public submission is not open yet. Do not send validator credentials through unofficial channels.
Prepare These Details
Keep the required information ready for the official validator review.
Node Checklist
The node should be secure, synchronized and operational before onboarding review.
What Happens After Submission
Applications are reviewed for infrastructure readiness, configuration, synchronization and operational suitability. Only approved validators receive pilot voting power.
Application submitted through the official channel
Server readiness verified
Node synchronization verified
Validator configuration reviewed
Pilot participation approved
Validator stake allocated
Active validator set entry confirmed
Performance monitored during the pilot
Use Official Onboarding Channels Only
Do not send validator private keys, consensus private keys or credentials through unofficial forms, messages or support channels.